Projects

Education

August Millard has been working with the Ministry of Education, Boards of Trustees and School Principals for many years, adhering to the Ministry’s guidelines.

Education Read More »

Waiuku

New build high end large house. August Millard were engaged to provide design management and consulting services including construction observations during construction.

Waiuku Read More »

Ellerslie Apartments

Remedial works to 24 X 3 storey townhouses split into two blocks of 10 and 14 townhouses including garages, pool and gym.

August Millard are engaged to provide design, building surveying, weathertightness and project management services.

Ellerslie Apartments Read More »

120 The Terrace

Levels 1-13 consist of a concrete structure with external decks, which forms the original part of the construction. Levels 14 and 15 were added in the late 1990s and consist of a light weight timber framing and direct fixed fibre cement cladding. The works involved the removal and replacement of the external cladding, deck membranes

120 The Terrace Read More »

126 The Terrace

Originally a 13 storey plus basement level office block that was converted into a 15-storey apartment complex in central Wellington. Levels 1 – 13 were constructed in 1960s and Levels 14-15 (penthouses) added late 1990s. The works involved Seismic repairs and fitout to ground floor entrance. Investigation and reporting to penthouse apartments.

126 The Terrace Read More »

Projects

Scroll to Top